
#471 - John’s Critical Path, Elis’s 0.0% Curry and Dave’s Not So Silent Alarm
Get every episode summarized
Each time Elis James and John Robins publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
About this episode
What starts off as a huge day for John (book deadline day) turns into a massive (massive it is) day for poor old Dave.
As the saying goes: ‘The best laid plans of podcast producers often go awry’, and Dave’s idea for the team to record remotely gets derailed quite spectacularly by a faulty alarm system. Brace yourselves for the most stressed you will probably ever hear one of the UK’s most unflappable men.
Back to John, and he tells us early on that he’s feeling ‘absolutely dreadful’. Book deadline day is taking its toll, but luckily a text from Elis’s brother-in-law lifts his spirits, as does the arrival of a record in the post for poor old stressed Dave.
There’s the start of a podcast feud with No Such Thing As A Fish, chat about successfully bartering with a supermarket, and the introduction of a new jingle that wouldn’t be out of place on Lou Reed’s Transformer.
To get in touch with the show, email [email protected]
For lots of exclusive EJJR #content, join our Patreon at patreon.com/elisandjohn
For weekly visual highlights, head to youtube.com/@elisandjohn
For everything else, head to elisandjohn.com
The Elis James and John Robins Show is a Significant Production
Hosted on Acast. See acast.com/privacy for more information.
Get every episode summarized
Each time Elis James and John Robins publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
Hosts & guests
No transcript yet
This episode has not been transcribed. Request it and it moves to the front of the queue.
More episodes
More from Elis James and John Robins

#580 - Seething Resentment, Lance Legstrong and Director Deputy Director General
Elis James and John Robins

#579 - Pad Cymru, Human Alps and A Constant Perma-Rolling Crisis
Elis James and John Robins

#578 - Inbetwosses, 8 Great Whites and The Pressures of Seagull Parents
Elis James and John Robins

#577 - Laundry Zero, Final Score Yoga and Mmm Meat Toms
Elis James and John Robins