About this episode
The architect, mechanical engineer of record and project manager of ASHRAE’s new global HQ discuss what went into deciding which HVAC systems to use and how the building operates. ASHRAE Treasurer Ginger Scoggins, P.E., Fellow ASHRAE, former chair of ASHRAE’s Building Ad Hoc Committee, Gregory Walker of Houser Walker Architecture and Stanton Stafford, P.E., of Integral Group also share lessons learned (1:55 and 16:15) from this high-profile project.
The trio discuss some of the challenges they came across, such as the task of creating a market-rate net zero energy project (2:13), building envelope issues (3:00 and 20:00) and adhering to a fast-paced construction schedule (3:19).
Then, Ginger, Greg and Stanton talk about how the design team chose between two options for the building’s HVAC systems (6:13) and how ASHRAE took a more innovative approach by choosing a technology not widely used in the Atlanta area (10:37).
More resources:
Get every episode summarized
Each time ASHRAE Journal Podcast publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
Hosts & guests
No transcript yet
This episode has not been transcribed. Request it and it moves to the front of the queue.
More episodes
More from ASHRAE Journal Podcast

63. What You Need to Know About the Federal Facilities IAQ Assessment Act
ASHRAE Journal Podcast

62. Analysis of 50 Energy Efficient Net Zero Buildings
ASHRAE Journal Podcast

61. Assembling the Team: Practical Tips for Hiring, Onboarding and Beyond
ASHRAE Journal Podcast

60. A Crash Course on Load Calculations
ASHRAE Journal Podcast