Skip to content
TrackPodcasts
businessAug 27, 20197:59pending

Short #69 - Trap & Vent

About this episode

In this short podcast episode, Bryan discusses the importance of the trap and vent in condensate drains. He also describes some trapping and venting best practices.

Anytime you have long runs of horizontal drains, you run the risk of having a double-trap. A double-trap creates a water seal, which traps air between the two traps and prevents a system from draining properly. To avoid the complications of double-traps, you can create a proper trap at the air handler. When making a P-trap, make sure the outlet is lower than the inlet; traps need some fall. Then, you would vent it.

When creating a vent, make sure it has enough height to be higher than the pan. That way, it should take longer for the drain to overflow if it backs up. If the system has a float switch, that should be tripped before condensate can overflow from the vent. On RTUs, the cleanout is close to the unit, and the vent will go after that; RTU units can have shorter vents. Do NOT cap the vents.

Some best practices to avoid double-traps include strapping the drain properly. PVC can be especially challenging because it tends to bow and bend over time. Location can also present challenges, as we run drains underground due to the building structures and geology in Florida, which can cause backups. However, in the end, the main goal is to create a drain line that prevents air from blocking up the drain and doesn't cause property damage when it backs up.

 

Learn more about Refrigeration Technologies HERE.

If you have an iPhone, subscribe to the podcast HERE, and if you have an Android phone, subscribe HERE.

Get every episode summarized

Each time HVAC School - For Techs, By Techs publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

No transcript yet

This episode has not been transcribed. Request it and it moves to the front of the queue.

Short #69 - Trap & Vent

HVAC School - For Techs, By Techs

0:00
7:59

More episodes

More from HVAC School - For Techs, By Techs

View all episodes →