
Scrum Mythbusters: Story Points are required in Scrum
About this episode
Why do we estimate work in Scrum? Are Story Points the best way to do this? And what about #noestimates? In this episode we address the myth that Scrum requires all work to be estimated in Story Points. In the process, we already explore what the purpose of estimation is in Scrum, and how it is very different from plan-based approaches.
We love to share our materials. Please help us by supporting our work. You can do so by giving us a thumbs-up on the platform you're listening on. Or follow us on Twitter, Medium or LinkedIn (Barry & Christiaan).
This podcast is an audio recording of this post on Medium:
http://bit.ly/2YVvLSp
Follow us on Medium:
https://medium.com/the-liberators
Or check out our upcoming events at:
https://theliberators.com/events
Donate to support our work
https://bit.ly/supportheliberators
We're building Columinity to help teams improve continuously based on scientific insights:
https://columinity.com
Check out our webshop for tons of powerful exercises and workshops to run with your team(s):
https://shop.theliberators.com
The music for episodes 91 and onward was written and produced for us by Basanite. The music for episodes 1-90 was acquired through Yummy Sounds. Post-production by Jasper Huiskamp.
Get every episode summarized
Each time The Liberators Podcast publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
Hosts & guests
No transcript yet
This episode has not been transcribed. Request it and it moves to the front of the queue.
More episodes
More from The Liberators Podcast

In-Depth: What Is The Optimal Size For A Scrum Team?
The Liberators Podcast

5 Effective Ways To Increase Management Support For Agile
The Liberators Podcast

In-Depth: Is SAFe® Really That Bad?
The Liberators Podcast

In-Depth: How To Make Pair Programming More Effective
The Liberators Podcast