
REM Airport Station: A Game-Changer for Montreal
About this episode
The REMs new airport station at Trudeau Airport is nearing completion, set to welcome its first trains by the end of 2027. This $600 million project features a unique iceberg-inspired design with a massive skylight, providing natural light to the deep platform. The station, located just 100 meters from check-in counters, offers a seamless connection to the terminal with high-speed elevators. The REMs airport station promises to alleviate airport traffic congestion, with downtown Montreal just 24 minutes away. While the airport station is still under testing, shuttles from the nearby Des Sources stop and road rebuilding projects are underway to maintain smooth operations.
Support the show:
Get a discount at https://solipillow.com/discount/dnn.
Advertise on DNN:
[email protected]
This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].
View sources & latest updates:
https://sources.thednn.ai/d7d84b1aa964f9ae
Get every episode summarized
Each time Canada News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
Transcript ready
13 searchable segments. Every word is indexed and playable.
Full transcript
Canada News Today | 2 Min News | The Daily News Now! — REM Airport Station: A Game-Changer for Montreal. Machine-transcribed; use the interactive transcript above to jump the player to any line.
The REM's new station at Trudeau Airport is almost ready, sitting at 80% complete and on track to welcome its first trains by the end of. 2027. This $600 million project serves as the end point for one branch of the automated light rail line, spanning 26 stations over, 67 kilometers total. Its standout design mimics an iceberg with a massive skylight 40 meters above, flooding the deep platform with natural light. Earlier this week, project director Steve Bofard gave reporters a tour right on the platform where trains will run 20 hours a day. Just 100 meters from check-in counters, passengers step off into a glazed walkway straight to the terminal, no parking lines or taxiways. Like the deepest REM stops, it dives the height of a 12-story building served by 10 high-speed elevators holding 20 people each. Bofard couldn't hide his pride, calling it the best station he's seen in a showcase for Quebec's engineers, architects and builders.
Airport media director Anne Sophie Hamel echoed that excitement, highlighting how it'll transform commutes for workers and visitors alike. This setup promises huge relief from the airport's chronic gridlock, where last summer's peak traffic jam back to Highway 20 and the 5. 20 expressway for over an hour. Downtown Montreal gets just 24 minutes away via REM, easing roads already in max capacity. Meanwhile, with the airport station still testing ahead, they're rolling out shuttles from the nearby day sources, stop opening the spring, plus. Rebuilding parking and roads through 2031 to keep things flowing smooth. That's your update from Canada News Today, powered by AI. I'm Corey with The Story.
More episodes
More from Canada News Today | 2 Min News | The Daily News Now!

Alberta Ballot Confusion Sparks Concern | Canada News
Canada News Today | 2 Min News | The Daily News Now!

August Jobs Dip But Yearly Trends Hold | Canada News
Canada News Today | 2 Min News | The Daily News Now!

Spritz Goes Big and Bold | Canada News
Canada News Today | 2 Min News | The Daily News Now!

Montreal Sunshine Ends Soon | Canada News
Canada News Today | 2 Min News | The Daily News Now!