Skip to content
TrackPodcasts
newsApr 27, 20261:41

NTx Power Line Project Threatens SA Food Bowl

About this episode

ElectraNets Northern Transmission Project (NTx) aims to boost electricity links across South Australia, but growers in the Northern Adelaide Plains fear one route could devastate their prime food bowl. The Adelaide option is deemed a disaster by AUSVEG SAs CEO, as towering lines could disrupt farming equipment and lock farmers out of their land. ElectraNet insists its too early to lock in a route, with a draft report due soon. The final decision on the route wont be made until mid-2026, but AUSVEG is advocating for the Gawler eastern path to protect the fresh produce industry.

Support the show:
Get a discount at https://solipillow.com/discount/dnn.

Advertise on DNN:
[email protected]

This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].

View sources & latest updates:
https://sources.thednn.ai/e600b8f7676f47d7

Get every episode summarized

Each time Adelaide News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Hosts & guests

Transcript ready

27 searchable segments. Every word is indexed and playable.

NTx Power Line Project Threatens SA Food Bowl

Adelaide News Today | 2 Min News | The Daily News Now!

0:00
1:41

Full transcript

Adelaide News Today | 2 Min News | The Daily News Now!NTx Power Line Project Threatens SA Food Bowl. Machine-transcribed; use the interactive transcript above to jump the player to any line.

It's April 27th. This is Adelaide News today, your AI-powered local news. Electronet is planning a big new power line project called the Northern Transmission Project, or NTX, to boost electricity links across South, Australia from the mid-north to greater Adelaide and Waiala. But growers in the Northern Adelaide Plains are sounding the alarm, saying one route could slice right through their prime food bowl that pumps out. For $1.5 billion in fresh produce every year. Last week, the company reached out to a few landowners to kick off community talks on three possible paths for the southern stretch. One hugging outer. North Adelaide, another through the mid-north and a third east of Gollor. AUSVG says CEO Jordan Brooke Barnett calls the Adelaide option a disaster waiting to happen. Growers worry, those towering lines would mess with pivot irrigators, tractors, harvesting gear, and even lock them out of parts of their land under.

Easement rules. The fresh produce industry is already hurting, with 30-40% of farmers eyeing an exit because times are so tough. Electronet's project director Dave Tancel pushes back, noting it's super early days with no route locked in yet. They say NTX is key to handling a jobs boom and surging power demand while keeping supply reliable and cheap. And they'll keep chatting with locals too. Minimize headaches. A draft report assessing options, costs, and benefits drop soon. But the final call on the route won't come until mid-2026. For now, AUSVG is pushing hard for that Gollor eastern path to keep the food both thriving.

More episodes

More from Adelaide News Today | 2 Min News | The Daily News Now!

View all episodes →