
NASA's New Moon Mission: Orion Capsule Tests
About this episode
NASAs Artemis program is accelerating its Moon landing plans with a new spacecraft docking test and increased production of the Space Launch System rocket. The agency will conduct an extra mission in 2027 to link up Orion capsule with lunar landers from SpaceX and Blue Origin. The changes also involve canceling a Boeing contract for a more powerful upper stage, aiming for yearly Moon missions. Contractors support the plan, and the first crewed landing is now set for 2028, with Artemis two launching in April. The move comes amid pressure from Chinas Moon landing ambitions.
Support the show
Get a discount at https://solipillow.com/discount/dnn.
Advertise on DNN
[email protected]
This is an automated, high-level news summary based on public reporting.
Report issues to [email protected]
View sources & latest updates
https://sources.thednn.ai/243ac22a28b69f78
Get every episode summarized
Each time Adelaide News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
Hosts & guests
Transcript ready
24 searchable segments. Every word is indexed and playable.
Full transcript
Adelaide News Today | 2 Min News | The Daily News Now! — NASA's New Moon Mission: Orion Capsule Tests. Machine-transcribed; use the interactive transcript above to jump the player to any line.
In Adelaide, it's February 28th, here's what is happening. NASA is shaking up its Artemis program with a new spacecraft docking test before the first crude moon landing in over 50 years. The agency plans an extra mission in 2027, right here in Earth's orbit, where the Orion capsule will link up with lunar landers from. SpaceX and Blue Origin. This comes as part of a big overhaul announced by NASA Chief Jared Isaacman to cut delays and speed things up. The changes also scrap plans to upgrade the space launch system rocket, shifting focus instead to boosting its production for at least one launch A year. That means canceling a $2 billion Boeing contract for a more powerful upper stage. The goal is yearly moon missions, up from the car pace of one every two or three years. Contractors are on board with the plan. Boeing says his team and supply chain can ramp up production, while Lockheed Martin praised the move. Isaacman stressed, this is the best path to hit lunar landing targets on time,
especially with safety experts pushing for more tests. All this ramps up amid pressure from China, which eyes its own crude moon landing by 2030. NASA's first crude landing, now Artemis 4, slips to 2028 to allow extra practice. Meanwhile, Artemis 2 is up next with a four astronaut crew flying around the moon and back. It's set for an April launch after fixes for hydrogen leak and upper-stage issues during recent rehearsals. Special thanks to our sponsor for supporting this episode. A pillow that sounds as good as it feels. Bill for listening in bed, S-O-L-I, solely pillow.com.
More episodes
More from Adelaide News Today | 2 Min News | The Daily News Now!

Labor Grants Accused of Pork-Barrelling | Adelaide News
Adelaide News Today | 2 Min News | The Daily News Now!

Practical Magic 2 Returns with Witchy Charm | Adelaide News
Adelaide News Today | 2 Min News | The Daily News Now!

Australia’s Summer Music Explosion | Adelaide News
Adelaide News Today | 2 Min News | The Daily News Now!

David Byrne on Curiosity and Music | Adelaide News
Adelaide News Today | 2 Min News | The Daily News Now!