Skip to content
TrackPodcasts
technologyFeb 3, 202649:57pending

Missouri Wants to Ban All Solar Construction for Two Years

About this episode

A Missouri state senator wants to ban all solar construction for two years, threatening a 430 MW project already under construction. On the Clean Power Hour Live, Tim Montague and John Weaver cover the Missouri solar moratorium, the first UL standard for balcony solar, Elon Musk's 100 GW solar manufacturing ambitions, and Vineyard Wind's court victory sending its final turbine to sea. They also dig into LFP cell prices hitting $60/kWh in China, zinc battery economics for commercial projects, and what a $2.3 trillion global energy transition spend means for the US market.

Episode Highlights:

A Missouri state senator filed legislation to halt all solar construction, including projects already underway, through the end of 2027. A 430 MW project set to double the state's solar capacity faces risk. (LinkedIn)

Balcony solar UL 3700 standard. UL released its first standard for balcony solar, UL 3700. (PV Magazine)

Musk's 100 GW solar manufacturing plan. Elon Musk announced SpaceX and xAI will each source 100 GW of solar to power data centers. (PV Magazine)

LFP cells race to 500+ Ah. Chinese battery manufacturers are scaling LFP cells from 314 Ah to 500 Ah and beyond. (PV Magazine)

Global clean energy investment reached a record $2.3 trillion in 2025, up 8% from 2024. (Bloomberg NEF)

Solar module prices from China rose 20 to 30% ahead of an April 1 export tax, adding 9 to 10% to costs. (PV Magazine)

This episode is for solar professionals, battery storage developers, project developers, and clean energy investors tracking policy risk and market shifts.

Support the show

Connect with Tim  

Clean Power Hour 
Clean Power Hour on YouTube
Tim on Twitter
Tim on LinkedIn 

Email [email protected] 

Review Clean Power Hour on Apple Podcasts

The Clean Power Hour is produced by the Clean Power Consulting Group and created by Tim Montague. Contact us by email:  [email protected]

Corporate sponsors who share our mission to speed the energy transition are invited to check out https://www.cleanpowerhour.com/support/

The Clean Power Hour is brought to you by CPS America, maker of North America’s number one 3-phase string inverter, with over 6GW shipped in the US. With a focus on commercial and utility-scale solar and energy storage, the company partners with customers to provide unparalleled performance and service. The CPS America product lineup includes 3-phase string inverters from 25kW to 275kW, exceptional data communication and controls, and energy storage solutions designed for seamless integration with CPS America systems.  Learn more at www.chintpowersystems.com

Get every episode summarized

Each time Clean Power Hour publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Hosts & guests

No transcript yet

This episode has not been transcribed. Request it and it moves to the front of the queue.

Missouri Wants to Ban All Solar Construction for Two Years

Clean Power Hour

0:00
49:57

More episodes

More from Clean Power Hour

View all episodes →