Skip to content
TrackPodcasts
newsApr 1, 20261:28

Leawood's Flooding Fix: Bypass Line for Wenonga Lane

About this episode

Leawoods Wenonga Lane faces recurring flooding issues, with over 30 homes and businesses affected after recent storms. The city plans a $5.5 million fix to upgrade pipes and stormwater systems, proposing a bypass line through Pawnee Lane to reroute water and reduce flooding. The plan, if approved, could bring relief within 5-6 years.

Support the show:
Get a discount at https://solipillow.com/discount/dnn.

Advertise on DNN:
[email protected]

This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].

View sources & latest updates:
https://sources.thednn.ai/aa3b6d943b91a483

Get every episode summarized

Each time Kansas City News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Hosts & guests

Transcript ready

24 searchable segments. Every word is indexed and playable.

Leawood's Flooding Fix: Bypass Line for Wenonga Lane

Kansas City News Today | 2 Min News | The Daily News Now!

0:00
1:28

Full transcript

Kansas City News Today | 2 Min News | The Daily News Now!Leawood's Flooding Fix: Bypass Line for Wenonga Lane. Machine-transcribed; use the interactive transcript above to jump the player to any line.

It's April 1st. You're listening to Kansas News today, AI-powered local news. Lee Woods dealing with major flooding headaches along with Nongolane from 119th Street to 133th Street. Heavy rains turned it into a lake back in 2013, with over three feet of water and rescues needed. Now, after storms hit hard on July 27th, flooding swamped 30 homes and businesses plus a city park. These cities pushing a $5.5 million fixed to upgrade pipes in stormwater systems. They tried repairs after that first flood, but funding shortages and land access problems stalled everything for years. Earlier this week, public works director David Lay updated the city council on jumping back in after recent downpours. Residents got fed up, especially with 24 rains hitting 19 homes and 14 streets, some under three feet of water again. First demanded action, and the council directed staff to find smarter ways around old roadblocks, like easements.

Engineers from water resource solutions pitched a bypass line to reroute water through Pawnee Lane, breaking up the flood timing where pipes converge. It's cheaper and less disruptive than bigger pipes on Wananga, and since Pawnee needs rebuilding anyway, it kills two birds with one stone. The plans early, needing Johnson County approval first. With Greenlit, construction kicks off next spring, wrapping in five to six years, bringing real relief to that soaked stretch.

More episodes

More from Kansas City News Today | 2 Min News | The Daily News Now!

View all episodes →