Skip to content
TrackPodcasts
newsMar 5, 20261:23

Hillingdon Roads: Major Closures in March for Utility Upgrades

About this episode

Hillingdon drivers, brace for major road closures in March! Essential utility upgrades will affect six roads, with the longest shutdown lasting 106 days. East Avenue in Hayes will be closed from March 9th to May 25th for gas main replacements. Shorter closures include New Years Green Lane in Harefield and Bellclose Road in West Drayton. Water main fixes in Ickenham will close Breakspear Road South and part of Copthall Road West from late March through May. Check signs and apps for real-time updates as projects roll out over the coming months.

Support the show:
Get a discount at https://solipillow.com/discount/dnn.

Advertise on DNN:
[email protected]

This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].

View sources & latest updates:
https://sources.thednn.ai/eb6ef8e95094962d

Get every episode summarized

Each time UK News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Hosts & guests

Transcript ready

17 searchable segments. Every word is indexed and playable.

Hillingdon Roads: Major Closures in March for Utility Upgrades

UK News Today | 2 Min News | The Daily News Now!

0:00
1:23

Full transcript

UK News Today | 2 Min News | The Daily News Now!Hillingdon Roads: Major Closures in March for Utility Upgrades. Machine-transcribed; use the interactive transcript above to jump the player to any line.

On March 5th, drivers in Hillington should brace for multiple road closures this March due to essential utility upgrades across the borough. Six roads will be affected by works from companies like Tim's Water, Cadent, and Affinity Water with the longest shutdown stretching 106 days. The biggest disruption hits East Avenue in Hayes, closing from 8 a.m. on Monday March 9th until 5 p.m. on Monday May 25th for gas. Main replacements, a diversion will guide traffic via East Way and Cold Harbor Lane. Shorter closures include New Year's Green Lane and Hairfield for just one day on Sunday March 22nd between 9 a.m. and 5 p.m. and a. Three days shutdown on Bell Close Road in West Straiton starting Tuesday March 31st. These come with detour options to ease the flow. In Iconham, Water Main fixes mean Brakespear Road South and part of Copthal Road West will close from late March through May with traffic rerouted around the latter via nearby drives and avenues.

Not all spots need diversions, so locals without alternatives may face direct impacts. Earlier this week, officials confirmed these changes aimed to boost safety during cabling and pipe work, urging drivers to check signs and apps for. Real-time updates as projects roll out over the coming months. Real-time updates as projects roll out over the coming months. Real-time updates as projects roll out over the coming months. Real-time updates as projects roll out over the coming months. Real-time updates as projects roll out over the coming months. Real-time updates as projects roll out over the coming months. Real-time updates as projects roll out over the coming months. Real-time updates as projects roll out over the coming months.

More episodes

More from UK News Today | 2 Min News | The Daily News Now!

View all episodes →