Skip to content
TrackPodcasts
newsApr 10, 20261:27

Eglinton Ave West & Allen Road: New Redesign Plans

About this episode

Torontos Eglinton Avenue West and Allen Road intersection, recently reopened after a decade of construction, is facing traffic congestion issues. City planners are studying a major redesign, considering options like a pedestrian bridge, tunnel, and widening the ramp mouth. Public meetings are scheduled for May and June, with a report on the top pick expected by early 2027 to provide long-term relief.

Support the show:
Get a discount at https://solipillow.com/discount/dnn.

Advertise on DNN:
[email protected]

This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].

View sources & latest updates:
https://sources.thednn.ai/a513458c13ad041b

Get every episode summarized

Each time Canada News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Hosts & guests

Transcript ready

24 searchable segments. Every word is indexed and playable.

Eglinton Ave West & Allen Road: New Redesign Plans

Canada News Today | 2 Min News | The Daily News Now!

0:00
1:27

Full transcript

Canada News Today | 2 Min News | The Daily News Now!Eglinton Ave West & Allen Road: New Redesign Plans. Machine-transcribed; use the interactive transcript above to jump the player to any line.

It's April 10th. This is Canada News today, AI-powered stories from your city. Toronto's Eglinton Avenue, West and Allen Road intersection just came out of nearly 10 years of construction headaches, but it's already gearing up for a major redesign. The spot reopened in May 2023, after the Eglinton cross-town LRT project wrapped up, yet traffic stays jammed solid, messing with flow on, nearby streets too. City planners want long-term fixes to smooth things out for everyone. Back before 2014, that northbound on-ramp had three lanes, but LRT builds shut things down for ages. They tried new turn lanes and pedestrian crosswalks when they reopened, plus tweets to signal timing last year. Still, none of that fully cleared the backups. Drivers and locals are fed up, dodging the mess by cutting through residential neighborhoods which only spreads the chaos. Conjection hits hard in this busy area, turning short trips into nightmares and frustrating daily commuters. Now the city's deep into a full study on redesigns, looking at stuff like a pedestrian bridge

or tunnel, and widening the Allen Road ramp mouth. They're checking the main intersection, plus surrounding blocks, with some quick winds already in play, like faster access to the new Cedar Vale station. Entrances Staff are talking to counselors and residents right now, with public meetings set for May and June. Expect a report on the top pick by early 2027, pushing for real relief that lasts.

More episodes

More from Canada News Today | 2 Min News | The Daily News Now!

View all episodes →