Skip to content
TrackPodcasts
businessMar 31, 201737:04pending

Ductless Installation P2 - Flaring, Charging and More

About this episode

Jesse and I talk about MORE best practices for installing ductless systems.

Both lines should be insulated on a ductless system because they have electric expansion valves in the outdoor unit. Insulating flares is also a critical task. When it comes to flare fittings, overconfidence is a tech's biggest enemy. Techs often undervalue the process of reaming copper or overdo it. Bubble-testing the flare joints is always a best practice to evaluate the integrity of your flares and check for leaks. Do not braze copper on ductless systems!

Ductless evacuations require deep vacuums. Removing cores and valving off are best practices for evacuation; the goal is to reduce the risk of contamination, just like normal split systems.

Get every episode summarized

Each time HVAC School - For Techs, By Techs publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

No transcript yet

This episode has not been transcribed. Request it and it moves to the front of the queue.

Ductless Installation P2 - Flaring, Charging and More

HVAC School - For Techs, By Techs

0:00
37:04

More episodes

More from HVAC School - For Techs, By Techs

View all episodes →