Skip to content
TrackPodcasts
newsMar 17, 20262:24

Craggy Dam's Future: Weighing River Restoration vs. Power Needs

About this episode

Craggy Dam: A Century-Old Debate Over Its Future

A 122-year-old dam on the French Broad River in North Carolina sparks a heated debate. Environmental groups want it removed for river restoration, while the Buncombe County Metropolitan Sewerage District argues for repairs due to hydropower benefits. A new analysis challenges the MSDs cash flow figures, suggesting a present-day value of just $3-6 million. Both sides push for a joint study to settle the price, with the coalition eyeing the next board meeting to pause repairs and weigh public benefits.

Support the show:
Get a discount at https://solipillow.com/discount/dnn.

Advertise on DNN:
[email protected]

This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].

View sources & latest updates:
https://sources.thednn.ai/bd8f4dc6938ce73a

Get every episode summarized

Each time Durham News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Transcript ready

33 searchable segments. Every word is indexed and playable.

Craggy Dam's Future: Weighing River Restoration vs. Power Needs

Durham News Today | 2 Min News | The Daily News Now!

0:00
2:24

Full transcript

Durham News Today | 2 Min News | The Daily News Now!Craggy Dam's Future: Weighing River Restoration vs. Power Needs. Machine-transcribed; use the interactive transcript above to jump the player to any line.

Welcome to Derm News Today, two minutes of news that matter to Derm. A 122-year-old concrete dam on the French broad river in Buncombe County, North Carolina sits at the heart of a heated debate over its future. Known as Craggy Dam, the 13-foot high-structure powers part of a local wastewater treatment plant owned by the Buncombe County Metropolitan, Sewerage District. Several groups in the Craggy Coalition won a third party to buy it at fair market value, remove it, and restore the river for public use. Sparking questions about its worth amid pushes for river health and flood control. Earlier this week, the debate gained steam at an MSD board meeting where officials presented a report from engineering firm Hatch, Outlining Steep. Repair costs and a projected net cash flow of $17.1 million over 30 years from hydro power. Meanwhile, the coalition points to a separate study estimating removal at $6.3 to $8.7 million

far below a demolition. Court of 20 million from another firm. Local advocates highlight big upsides to removal. Like reviving fish habitats, cutting flood risks, and unlocking 3.5 miles of whitewater. For tourism and recreation, river supporters say it's the best move for the community's long-term river health, while MSD leaders worry about higher grid power costs, environmental trade-offs, and protecting rate payers from expenses. New analysis from an energy economist challenges the MSD's cash flow figures, suggesting a present-day value of just $3 to $6 million. After accounting for risks like droughts and repairs, the Hatch reported self-notes a discounted value around $2 million at a 6% rate, fueling calls for an independent valuation. Now both sides push for a joint, transparent study to settle the price, with the coalition eyeing the next board meeting to pause repairs in way. Public benefits. MSD plans to propose evaluation consultant soon,

as talks continue on balancing power needs with river restoration across the region. D&N is sponsored by our partner. Solly Pillow is a pillow with built-in headphones, lay back, press play, and disappear into what you are listening to. S-O-L-I.

More episodes

More from Durham News Today | 2 Min News | The Daily News Now!

View all episodes →