Skip to content
TrackPodcasts
businessDec 23, 202515:49pending

Bitdeer’s U.S. Manufacturing Bet And Cipher’s 200 MW Ohio Push!

Power Analysis

About this episode

We track a steady Bitcoin price and light holiday volumes while spotlighting the bigger shift: how AI and HPC demand, new tariff rules, and efficiency gains are reshaping mining strategy. Bitdeer moves manufacturing to Nevada and Cipher secures 200 MW in PJM as policy momentum builds.

• Bitcoin price hovering high‑80k with muted tape
• Miner board mixed while HPC‑linked names hold interest
• Bitdeer leases Reno facility to assemble SEAL miners
• SEAL A4 efficiency targets, iteration, and margin math
• Power costs versus fleet efficiency and payback windows
• Cipher expands beyond Texas with 200 MW in Ohio
• PJM policy shifts and FERC tariff directives
• ERCOT bottlenecks, diversification across grids, timelines
• Predictions for 2026 and strategy around energized MW

Sign up for the newsletter under the News dropdown at powermininganalysis.com to auto-register for Miner Madness 5.0!


Anthonys Info:

Website:

https://www.powermininganalysis.com

X: 

https://twitter.com/cazenove_uk

Patreon:

https://www.patreon.com/Cazenove_UK

Bryce's Info:

X:

https://twitter.com/McnallieM

Patreon:

https://www.patreon.com/McNallieMoney

Merch:

https://shop.mcnalliemoney.com/

Website:

https://www.mcnalliemoney.com

Business Inquiries:

Email - [email protected]

Get every episode summarized

Each time Power Analysis publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Hosts & guests

No transcript yet

This episode has not been transcribed. Request it and it moves to the front of the queue.

Bitdeer’s U.S. Manufacturing Bet And Cipher’s 200 MW Ohio Push!

Power Analysis

0:00
15:49

More episodes

More from Power Analysis

View all episodes →