Skip to content
TrackPodcasts
newsMar 24, 20261:36

Airport Blvd Extension Starts in Morrisville

About this episode

Construction begins on Airport Boulevard extension in Morrisville, NC, aiming to ease traffic congestion. The $12.8 million project, funded by local funds and a federal grant, will create a four-lane road with a raised median, sidewalk, and multi-use path. Despite concerns from nearby residents, the project moves forward, with the next phase, a bridge over Chapel Hill Road and railroad tracks, still awaiting funding.

Support the show:
Get a discount at https://solipillow.com/discount/dnn.

Advertise on DNN:
[email protected]

This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].

View sources & latest updates:
https://sources.thednn.ai/8666a6e358657227

Get every episode summarized

Each time Durham News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Hosts & guests

Transcript ready

16 searchable segments. Every word is indexed and playable.

Airport Blvd Extension Starts in Morrisville

Durham News Today | 2 Min News | The Daily News Now!

0:00
1:36

Full transcript

Durham News Today | 2 Min News | The Daily News Now!Airport Blvd Extension Starts in Morrisville. Machine-transcribed; use the interactive transcript above to jump the player to any line.

Construction is about to start on a new stretch of airport Boulevard in Morrisville, North Carolina. The State Department of Transportation just awarded a contract for less than a half mile extension from Garden Square Lane across Town Hall Drive, all the way to Church Street. It will be a four-lane road with a raised median, a sidewalk on the north side, and a 10-foot multi-use path on the south side. Officials expected to wrap up by June 2028. This marks the first phase of a project planned for more than two decades to link disconnected parts of the road. The town is footing the $12.8 million bill using local funds and a federal grant. The next phase, which would build a bridge over Chapel Hill Road and Railroad tracks to reach Davis Drive from Interstate 40, remains on hold. Without funding yet, local leaders see the full road as a big win for traffic flow. Easing congestion on nearby Aviation Parkway, McCrimmon Parkway, and Morrisville, Carpenter Road. That said, some nearby residents pushed back hard with a petition signed by 196 people, worried about impacts to there.

Neighborhoods in the environment. The petition didn't sway town officials though. Mayor T.J. Colley pointed out the route was reserved years ago, right between those subdivisions and all the prep work is done, design, engineering. Right of voice secured and utilities relocated. With construction greenlit, this step forward promises smoother drives through Morrisville, even as talks continue on funding the final connection. Derm news today, powered by AI bringing you what matters.

More episodes

More from Durham News Today | 2 Min News | The Daily News Now!

View all episodes →