Skip to content
TrackPodcasts
societyMar 17, 20261:01:25failed

280: Scaling Passive House in Massachusetts with Nick Nigro

About this episode

In this episode of The Passive House Podcast, Zack Semke chats with Nick Nigro of Leggat McCall about the Bunker Hill Housing Redevelopment in Charlestown, Boston, a phased replacement of 42 aging WWII-era public housing buildings into 2,699 mixed-income units. Nick explains how the team committed to Passive House from day one and is using a repeatable “kit of parts”—precast lateral-load-bearing cores, prefabricated load-bearing exterior panels, and CLT floor systems—to improve speed, reduce temporary work, and lower both carbon and cost through iteration across 15 buildings. He describes early modeling, enclosure mockup testing, and construction-sequencing innovations like using the permanent elevator as a hoist. 


https://passivehouseaccelerator.com/articles/critical-mass-scaling-passive-house-at-bunker-hill
https://www.lmp.com/

Thank you for listening to the Passive House Podcast! To learn more about Passive House and to stay abreast of our latest programming, visit passivehouseaccelerator.com. And please join us at one of our Passive House Accelerator LIVE! zoom gatherings on Wednesdays.

Get every episode summarized

Each time Passive House Podcast publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Hosts & guests

No transcript yet

This episode has not been transcribed. Request it and it moves to the front of the queue.

280: Scaling Passive House in Massachusetts with Nick Nigro

Passive House Podcast

0:00
1:01:25

More episodes

More from Passive House Podcast

View all episodes →