
116. Behind Schedule? What to Do and How to Prevent It in the Future
About this episode
No matter what subject or grade you teach or how long you’ve been teaching, you have been behind schedule at least at one point in your career. Trust me, I’ve been there, and it is stressful! Especially if you have an end-of-year test that you’re preparing for. But instead of feeling overwhelmed, in today’s episode, I’m sharing ways to assess why you’re behind schedule and providing practical ways to prevent it from happening in the future.
When we start to get behind schedule, our natural reaction is to either rush students or cut instructional resources. However, I caution you to do either of those, for it can bring down student enthusiasm and change your demeanor as a teacher.
Instead, I give you four questions to ask yourself where you can begin to assess why you’re behind, which can be eye-opening to what you find important and how much instructional time you actually have. Then, after assessing, I share practical ways you can get back on track or prevent you from being behind schedule in the future.
It’s natural to get behind schedule when you have so much science content to teach, but it’s so important to learn where it’s coming from and how to fix it. So, if you’re struggling to fit all of your content in before a big test or the end of the year, this episode is for you!
Resources Mentioned:
- Free Lab Audit
- Anatomy of a Class Period
- Download your FREE Classroom Reset Challenge
- Send me a DM on Instagram: @its.not.rocket.science
- Send me an email: [email protected]
- Follow, rate, and review on Apple Podcasts
Show Notes: https://itsnotrocketscienceclassroom.com/episode116
Get every episode summarized
Each time Secondary Science Simplified™ publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
Hosts & guests
No transcript yet
This episode has not been transcribed. Request it and it moves to the front of the queue.
More episodes
More from Secondary Science Simplified™

233. How to Keep Up With Lesson Planning
Secondary Science Simplified™

231. Teaching on an Island: What to Do When Parents and Admin Won’t Help
Secondary Science Simplified™

230. How to Manage Test Retakes
Secondary Science Simplified™

229. Balancing Unrealistic Admin Expectations
Secondary Science Simplified™