
Route 9 Northbound: Major Safety Upgrades Cause Delays
About this episode
Connecticut drivers, brace for traffic disruptions on Route nine north and southbound from April 6th to 16th, 2026. Intermittent holds between 9 am and 3 pm are expected, mainly around exits 22 to 24 in Middletown, for a major safety upgrade on the Route seventeen on-ramp to Route nine northbound. The project, valued at $54 million, is set to complete in 2027. Plan for delays, as rolling roadblocks could last up to ten minutes and weather or site needs might shift the schedule. The upgrades aim to reduce crash hotspots and improve traffic flow.
Support the show:
Get a discount at https://solipillow.com/discount/dnn.
Advertise on DNN:
[email protected]
This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].
View sources & latest updates:
https://sources.thednn.ai/23a781f73e9924f8
Get every episode summarized
Each time Hartford News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
Hosts & guests
Transcript ready
17 searchable segments. Every word is indexed and playable.
Full transcript
Hartford News Today | 2 Min News | The Daily News Now! — Route 9 Northbound: Major Safety Upgrades Cause Delays. Machine-transcribed; use the interactive transcript above to jump the player to any line.
Connecticut drivers heads up on some upcoming traffic headaches on Route 9 North and Southbound. Starting Monday, April 6th through Thursday, April 16th, 2026, expect intermittent holds between 9am and 3pm mainly. Around exits, 22 to 24 in Middletown. These stops are for a big safety upgrade on the Route 17 Enramp to Route 9 Northbound. The state dot handed the job to Middlesex Construction back in 2023 for $50,400,000 with full. Completion set for 2027. Rolling roadblocks could last up to 10 minutes so heavy rigs can slip in and out of the work zone safely. All lanes stay open over the holiday on April 3rd and 5th but plan for delays since weather or sight needs might shift to schedule. The fixes target crash hotspots from that skewed ramp and shore merge lane overlapping with harbor drive traffic. Crews are adding a thousand foot acceleration lane, ditching the old harbor drive on ramp, building retaining walls and widening the bridge over.
Union street. Motorists should build an extra time through this corridor. It's all about smoother flows and fewer rear enders down the line, part of broader route. Nine tweaks tracing back to its 1932 origins. Stay sharp out there. That's the story for today, Hartford News Today, driven by AI. I'm Corey with the story.
More episodes
More from Hartford News Today | 2 Min News | The Daily News Now!

Hartford Honors 911 Through Service | Hartford News
Hartford News Today | 2 Min News | The Daily News Now!

Connecticut Tax War Heats Up | Hartford News
Hartford News Today | 2 Min News | The Daily News Now!

Lamont Attacks Fazio Over Immigration Law | Hartford News
Hartford News Today | 2 Min News | The Daily News Now!

ALICE Reveals Wider Economic Struggles | Hartford News
Hartford News Today | 2 Min News | The Daily News Now!