Skip to content
TrackPodcasts
newsApr 25, 20261:25

Raleigh's Fire Station Three Gets Major Upgrade

About this episode

Raleighs Fire Station three unveils a spacious, modern upgrade, boasting over eleven thousand square feet, more than three times the size of its predecessor. The new station, set to open on April 27, 2026, features a private patient check room and a decontamination area. Initially housing one engine company of twelve firefighters, its poised to accommodate twenty-four once an electric fire engine is introduced. The eleven million dollar investment is set to strengthen Raleighs firefighting capabilities, with a quirky note being the citys skip of Station thirteen.

Support the show:
Get a discount at https://solipillow.com/discount/dnn.

Advertise on DNN:
[email protected]

This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].

View sources & latest updates:
https://sources.thednn.ai/0fe5c95748a5ae3a

Get every episode summarized

Each time Durham News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Transcript ready

24 searchable segments. Every word is indexed and playable.

Raleigh's Fire Station Three Gets Major Upgrade

Durham News Today | 2 Min News | The Daily News Now!

0:00
1:25

Full transcript

Durham News Today | 2 Min News | The Daily News Now!Raleigh's Fire Station Three Gets Major Upgrade. Machine-transcribed; use the interactive transcript above to jump the player to any line.

Raleigh Spire Station 3 is getting a major upgrade, opening its doors on Monday, April 27th, 2026, right on rock, Quarry Road. This new spot is over 11,000 square feet, more than three times bigger than the old one, and is sitting just south of Martin Luther King. Junior Boulevard. The current station on southeast street has been around for 75 years, making it the smallest and one of the busiest in the city with. 28 stations total. Firefighters there have been crammed in tight, but now they've got room to breathe with two bays and modern setups. Assistant Fire Chief Danny Poole says the crew is pumped about ditching the outdated building for this fresh space, complete with a private room too. Check patience and a decontamination area to keep gear hazards away from living quarters. It's starting with one engine company of 12 firefighters, but get this, is the first Raleigh Station ready to charge an electric fire engine. Which means it'll double to 24 folks once that rolls out in a few years.

Cost? 11.5 million dollars well spent. And here's a quirky note, Raleigh's skip station 13 altogether, since engine 13 shares with engine 1 downtown. Maybe, superstition, maybe, just how it's been since way back. This move sets station 3 up strong for whatever comes next in the city. I'm Quarry with the story, and you've been listening to Derm News today, AI-powered local news.

More episodes

More from Durham News Today | 2 Min News | The Daily News Now!

View all episodes →