Skip to content
TrackPodcasts
newsMar 17, 20262:06

Pavement Preservation Work in Surprise

About this episode

Send us a text and chime in!

The City of Surprise’s pavement preservation contractor will be sealing cracks on the following roadways Monday, March 16 – Friday, March 20, between the hours of 8:30 a.m. and 3:30 p.m., resulting in temporary lane restrictions: Marley Park Sweetwater Ave (Bullard Rd - Reems Rd) This work will require rolling temporary closures at each entrance point and within the active work zone. An off-duty officer will direct traffic at entrances. Greer Ranch Greer Ranch Pkwy (Cactus Rd - Peoria Ave) Cholla St (Reems Rd – Sarival Ave) Rancho Gabriela Cholla St (Reems Rd - Sarival Ave) 151st Ave (Cactus Rd...

 

For the written story, read here >> https://www.signalsaz.com/articles/pavement-preservation-work-in-surprise/

Check out the CAST11.com Website at: https://CAST11.com 
Follow the CAST11 Podcast Network on Facebook at: https://Facebook.com/CAST11AZ
Follow Cast11 Instagram at:
https://www.instagram.com/cast11_podcast_network

Interactive timestamps

Jump to segment

Get every episode summarized

Each time SignalsAZ.com - Arizona News Podcast publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Hosts & guests

Transcript ready

20 searchable segments. Every word is indexed and playable.

Pavement Preservation Work in Surprise

SignalsAZ.com - Arizona News Podcast

0:00
2:06

Full transcript

SignalsAZ.com - Arizona News PodcastPavement Preservation Work in Surprise. Machine-transcribed; use the interactive transcript above to jump the player to any line.

0:00Text-to-speech audio articles made possible on the cast11.com podcast network by Fane Signature Group. The City of Surprise's pavement preservation contractor will be sealing cracks on the following roadways Monday, March 16, Friday, March 20, between the hours of 8.30 a.m. and 3.30 p.m., resulting in temporary lane restrictions. Marley Park. Sweetwater Avenue, Bullard Road, Reams RD. This work will require rolling temporary closures at each entrance point and within the active work zone. An off-duty officer will direct traffic at entrances. Greer Ranch. Greer Ranch Parkway, Cactus Road, Peoria Avenue. Cullo ST, Reams Road, Sarival Avenue. Rancho Gabriela. Cullo ST, Reams Road, Sarival Avenue. 151st Avenue, Cactus Road, Cullo ST. Gabriela Drive, Cullo ST, Cullo ST. Cullo ST, Bullard Avenue, Reams RD.

1:04Sycamore Farms. Genon Drive, Sarival Road, Cullo ST. 165th Drive, Cullo ST, Desert Mirage Doctor. Cullo ST, Sarival Avenue, 166th Dr. Royal Ranch. Locometta Avenue, Wadell Road, Boca Raton RD, and Greenway Road, Porto Prince Lane. Akima Drive, Bullard Avenue, 146th Avenue. This is a moving operation with a flagger setup. Motorists should expect lane shifts and traffic control throughout the work zone. Roads will be opened as soon as work is complete. Maps and details of the projects are available at surprise as .gov slash ppp. Drivers are asked to use caution, follow posted traffic control, and allow extra travel time. We appreciate your patience as we work to preserve and extend the life of city roadways. Read more stories from the Phoenix area on signals az.com. Subscribe and be the F-1 RST-2-0.

More episodes

More from SignalsAZ.com - Arizona News Podcast

View all episodes →