Skip to content
TrackPodcasts
newsMar 6, 20261:16

New Pump House Bridge Opens Friday, US 280 Widening Project Continues

About this episode

Get ready for the grand opening of the new Pump House Bridge over US two eighty this Friday, March sixth, weather permitting! The bridge, part of the ongoing widening project, will replace the old bridge with nightly lane closures from March eighth to twelfth and a full traffic shutdown over the Pump House Road area during the weekend of March twentieth to twenty-second. ALDOT will share detour details soon, and the area has seen other upgrades this winter, including a new pedestrian access project and a fresh mural.

Support the show:
Get a discount at https://solipillow.com/discount/dnn.

Advertise on DNN:
[email protected]

This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].

View sources & latest updates:
https://sources.thednn.ai/18119b0ac490e9a0

Get every episode summarized

Each time Birmingham News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Transcript ready

19 searchable segments. Every word is indexed and playable.

New Pump House Bridge Opens Friday, US 280 Widening Project Continues

Birmingham News Today | 2 Min News | The Daily News Now!

0:00
1:16

Full transcript

Birmingham News Today | 2 Min News | The Daily News Now!New Pump House Bridge Opens Friday, US 280 Widening Project Continues. Machine-transcribed; use the interactive transcript above to jump the player to any line.

On March 6th, here's the latest out of Birmingham. The Alabama Department of Transportation is set to open the new pump house bridge over US 280 this Friday, March 6th in the evening as long as the weather holds up. Back in November, Cruz installed the first three of five girders for this new span, which is part of the ongoing widening project along US 280. Drivers should prepare for some disruptions from the old bridge demolition, which kicks off Sunday, March 8th at 7pm with nightly lane. Closures through Thursday, March 12th, reopening each morning at 6am. That work continues with similar closures from March 15th to 19th, leading to a full traffic shutdown over the pump house road area during. The weekend of March 20th to 22nd, weather permitting, meanwhile, Al. plans to share detour details soon in the areas seen other upgrades this winter, like a new pedestrian access project announced. Last week on the Hollywood Boulevard Overpass and a fresh mural near the Overton Road

Light. D&N is sponsored by our partner. Check out the episode description. Your favorite podcasts, music or sleep sounds coming from your pillow, no earbuds, no distractions, listen and relax, S-O-L-I, solelypillow.com.

More episodes

More from Birmingham News Today | 2 Min News | The Daily News Now!

View all episodes →