
New Bridge Opens Over Raleigh Beltline
About this episode
A new bridge has opened over the Raleigh Beltline, replacing a decades-old tunnel that once connected the Method neighborhood to NC State. The new bridge, now part of a larger NCDOT project, offers two lanes, sidewalks, and improved accessibility for all. The tunnel, once a narrow, low-clearance passage, has been filled with concrete and buried to prevent future collapses.
Support the show:
Get a discount at https://solipillow.com/discount/dnn.
Advertise on DNN:
[email protected]
This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].
View sources & latest updates:
https://sources.thednn.ai/3b495f58ee6e7d86
Get every episode summarized
Each time Durham News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
Hosts & guests
Transcript ready
17 searchable segments. Every word is indexed and playable.
Full transcript
Durham News Today | 2 Min News | The Daily News Now! — New Bridge Opens Over Raleigh Beltline. Machine-transcribed; use the interactive transcript above to jump the player to any line.
It's April 6th, from your city to your ears. This is Durham News Today, powered by AI. A brand new bridge just opened over the Raleigh Belt Line on Lygon Street, swapping out a sketchy one-lane tunnel that's been there since the early, 1960s. This spot on Interstate 440 used to be cars only. Squeezing under the highway between Hillsboro Street and Western Boulevard, now it's got two lanes plus sidewalks, making it easy for cars, trucks, buses, walkers, and bike riders to cross. The bridge hooks up North Carolina State University's main campus with key spots on the west side, like the JC Raulston Arboretum, research labs, and warehouses. Back in the day, that tunnel linked the method neighborhood to Oak Grove Cemetery, and NC State had fields and orchards over there before they built. It all out. Felt to drill through, remember the drill crawl, to a near stop, peak for headlights or shadows coming the other way. Total yield or crash vibes,
it was narrow and low, demanding real driver courtesy just to make it across without drama. This upgrades part of a massive NCDOT push to widen the belt line from Wade Avenue to Interstate 40 and carry. That project's mostly wrapped, but there's still tweaking interchanges at Wade, Hillsboro, and Western. They shut the tunnel back in April 2022, pumped it full of concrete, and buried the ends under gravel to keep it from collapsing under. The road someday. Now the area's flowing smoother, bridging gaps that held folks back for decades.
More episodes
More from Durham News Today | 2 Min News | The Daily News Now!

NATS Glitch Grounds 1750 Flights | Durham News
Durham News Today | 2 Min News | The Daily News Now!

Alix Earle Reveals Behind-the-Scenes Drama | Durham News
Durham News Today | 2 Min News | The Daily News Now!

Ella and Belmont Reunite on Set | Durham News
Durham News Today | 2 Min News | The Daily News Now!

Sam Jones BBQ Expands to Raleigh Food Hall | Durham News
Durham News Today | 2 Min News | The Daily News Now!