
New Bridge Opens on US-280 in Alabama
About this episode
Alabama transportation officials commence the first phase of a new bridge at Pump House Road over U.S. Route two eighty, aiming to alleviate daily congestion for the hundred thousand drivers. Nighttime lane closures and overnight demolitions are planned from March 6th to 22nd, with a full shutdown of U.S. Route two eighty at Pump House Road during the weekend of March 20th to 22nd. The full widening project is expected to conclude by October 1st.
Support the show:
Get a discount at https://solipillow.com/discount/dnn.
Advertise on DNN:
[email protected]
This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].
View sources & latest updates:
https://sources.thednn.ai/d7d8d480268ad90b
Get every episode summarized
Each time Birmingham News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
Transcript ready
20 searchable segments. Every word is indexed and playable.
Full transcript
Birmingham News Today | 2 Min News | The Daily News Now! — New Bridge Opens on US-280 in Alabama. Machine-transcribed; use the interactive transcript above to jump the player to any line.
It's March 6, here's your Birmingham news in two minutes. Alabama transportation officials are opening the first part of a new bridge at Pump House Road over US Route 280. Starting Friday night on March 6, drivers will shift onto this new section, weather permitting. This move is part of a larger effort to widen the highway between Homewood and Interstate 459. Crews installed the first three girders back in November, and now with traffic on the new span, they can start tearing down the old bridge. Nighttime lane closures begin Sunday, March 8 at 7pm, and run through Thursday, March 12, with lanes reopening each morning at 6am. This highway sees about 100,000 drivers every day, so these changes aim to ease congestion in the long run. Officials appreciate the public's patience during the disruptions. Demolition work will continue with more overnight closures from March 15 through 19. A full shutdown of US Route 280 at Pump House Road is set for the weekend of March 20 to 22nd.
More details on exact times in Detour Routes will come soon. The full widening project should wrap up and open to traffic by October 1. The Daily News Now is presented by our sponsor, linked in the description. Your bedtime ritual just got better. Built-in sound, built-in comfort, I-S-O-L-I-S-O-L-Pillow.com
More episodes
More from Birmingham News Today | 2 Min News | The Daily News Now!

Missing Teen in Decatur Needs Your Help | Birmingham News
Birmingham News Today | 2 Min News | The Daily News Now!

Stein's Wildcats Face Alabama | Birmingham News
Birmingham News Today | 2 Min News | The Daily News Now!

The Transcendent Roots of Conservatism | Birmingham News
Birmingham News Today | 2 Min News | The Daily News Now!

Mayor Cheriogotis’ Bold Waterfront Vision | Birmingham News
Birmingham News Today | 2 Min News | The Daily News Now!