Skip to content
TrackPodcasts
newsMar 20, 20261:23

NASA's Space Launch System Rolls to Moon Mission

About this episode

NASAs Space Launch System rocket, featuring the Orion spacecraft, is set to roll out to Pad 39B at Kennedy Space Center for the Artemis II mission, aiming to loop around the Moon. After a March setback, engineers have resolved a helium system issue, and the four-person crew has begun pre-flight quarantine. The ten-day flight will test systems for future lunar landings, with the first launch attempt on April 1st at 6:24 PM Eastern time.

Support the show:
Get a discount at https://solipillow.com/discount/dnn.

Advertise on DNN:
[email protected]

This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].

View sources & latest updates:
https://sources.thednn.ai/d436010b04c45e7b

Get every episode summarized

Each time Global News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Hosts & guests

Transcript ready

20 searchable segments. Every word is indexed and playable.

NASA's Space Launch System Rolls to Moon Mission

Global News Today | 2 Min News | The Daily News Now!

0:00
1:23

Full transcript

Global News Today | 2 Min News | The Daily News Now!NASA's Space Launch System Rolls to Moon Mission. Machine-transcribed; use the interactive transcript above to jump the player to any line.

This is Global News Today, every region, every story, every day. NASA's massive space-launched system rocket, stacked with the Orion spacecraft, is heading to the launch pad at Kennedy Space Center in Florida for a second try. This 98-meter tall giant is rolling four miles to pad 39B, ahead of Artemis II, the first crewed mission to loop around the moon. In over 50 years, the move follows a snag back in March, when a helium system glitch halted fueling tests and sent the rocket back indoors for fixes. Engineers replace parts in the upper stage, tested everything inside the huge vehicle assembly building, and now say the problem is solved. The four-person crew, Reed Wiseman, Victor Glover, Christina Koch, and Jeremy Hansen, has started pre-flight quarantine and will head to Florida soon. For dress rehearsals, this 10-day flight will take them around the moon's far side and back, testing systems for future landings. At the pad, teams will run pressure checks on the helium setup, reconnect the launch

tower, and practice countdown steps without loading fuel. If all goes well, mission managers will review data just before the first launch shot on April 1st, at 6.24pm eastern time. Back up windows follow on April 2nd through 6th, and then the 30th. A smooth rollout sets the stage for Artemis II to kick off NASA's return to the moon with humans aboard.

More episodes

More from Global News Today | 2 Min News | The Daily News Now!

View all episodes →