Skip to content
TrackPodcasts
newsMay 3, 20261:11

M8 Bridge Refurbishment: Plan Ahead for Delays

About this episode

Motorists on the M8 in West Lothian, prepare for significant weekend delays from May 8th to 11th and May 15th to 18th. BEAR Scotland commences major bridge refurbishment over the River Almond near Whitburn, causing contraflow and lane closures. Expect a 40 mph speed limit, closed junctions, and potential weather-related delays. The work aims to waterproof and repair the bridge deck for long-term safety.

Support the show:
Get a discount at https://solipillow.com/discount/dnn.

Advertise on DNN:
[email protected]

This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].

View sources & latest updates:
https://sources.thednn.ai/824c111bf14e02b0

Get every episode summarized

Each time Edinburgh News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Hosts & guests

Transcript ready

18 searchable segments. Every word is indexed and playable.

M8 Bridge Refurbishment: Plan Ahead for Delays

Edinburgh News Today | 2 Min News | The Daily News Now!

0:00
1:11

Full transcript

Edinburgh News Today | 2 Min News | The Daily News Now!M8 Bridge Refurbishment: Plan Ahead for Delays. Machine-transcribed; use the interactive transcript above to jump the player to any line.

Drivers on the M8 in West Lothian, brace yourselves for some serious delays this weekend and the next. B-E-A. Escotland? Kicks off major refurbishment on the bridge over the River Almen near Whipburn, hitting the weekends of May 8th through 11th and May 15th through 18th. Contraflow sets up between Junctions 3A and 4A, squeezing traffic to just one lane in each direction from 8.30pm Friday to 6am Monday. Expect a 40mph speed limit too, so plan ahead if you're heading that way. First weekend, the Junction 4E Spawn Offslip shuts down, and the second weekend closes the Westbound Onslip and Offslip at that junction. These changes will slow things way down on this busy stretch. The work waterproofs and repairs, the bridge deck, to keep it safe long term, and cut down on emergency fixes later. Full damage won't show until they peel back the old surface, but crews aim to reopen fully by Monday mornings each time. Weather could push things the June 5th through 8th if rain hits hard,

so check updates, build in extra time, or pick another route to dodge the hassle. That's your update from Edinburgh News Today, powered by AI.

More episodes

More from Edinburgh News Today | 2 Min News | The Daily News Now!

View all episodes →