About this episode
In this episode, Seth interviews Rich Szecsy, an executive in the concrete supply industry. They discuss the recent change in the batch time for concrete from 90 minutes to 120 minutes.
Rich explains the history behind the 90-minute time limit and the lack of scientific justification for it. He emphasizes the importance of considering the practicality and sustainability of construction methods. They also touch on the topic of temperature specifications for concrete and the need for a more nuanced approach.
Takeaways
- The 90-minute time limit for concrete batch time has been in place since the 1930s, but there is no scientific justification for it.
- The recent change to a purchaser-determined batch time allows for more flexibility and practicality in construction projects.
- Temperature specifications for concrete should be based on the specific conditions and requirements of each project, rather than arbitrary limits.
- The focus should be on building something and finding the most efficient and sustainable methods to achieve that goal.
- The responsibility of a concrete producer is to the purchaser, and specifications should be tailored to meet their needs and preferences.
Chapters
00:00 Introduction and Background
05:34 The Change from 90 Minutes to 120 Minutes
11:05 The History and Justification of the 90-Minute Time Limit
27:48 Rethinking Temperature Specifications
38:04 Prioritizing Practicality and Sustainability
38:54 The Responsibility of Concrete Producers
***
Did you learn something from this episode? If so, please consider donating to the show to help us continue to provide high-quality content for the concrete industry.
Donate here: https://www.concretelogicpodcast.com/support/
***
Episode References
Guest: Rich Szecsy | [email protected]
Guest Website: https://www.linkedin.com/in/rich-s-szecsy-phd-pe-faci-8724992/
Producers: Jodi Tandett
Donate & Become a Producer: https://www.concretelogicpodcast.com/support/
Music: Mike Dunton | https://www.mikeduntonmusic.com | [email protected] | Instagram @Mike_Dunton
Host: Seth Tandett, [email protected]
Host LinkedIn: https://www.linkedin.com/in/seth-tandett/
Website: https://www.concretelogicpodcast.com/
LinkedIn: https://www.linkedin.com/company/concrete-logic-podcast
Get every episode summarized
Each time Concrete Logic publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
Hosts & guests
No transcript yet
This episode has not been transcribed. Request it and it moves to the front of the queue.
More episodes
More from Concrete Logic

EP #156: Is Rebar Killing Your Concrete Schedule?
Concrete Logic
EP #155: EPDs, Data Centers, and the New Paperwork Hitting Concrete Producers
Concrete Logic
EP #154: Why Concrete Is on the Critical Path for AI Data Centers
Concrete Logic

EP #153: Your Concrete Mix Design Still Isn’t Ready… Until You Do This
Concrete Logic