Skip to content
TrackPodcasts
educationSep 15, 202243:59pending

EP #021 - Supporting Concrete for 1,900 Years

Concrete Logic

About this episode

It is believed that the Pantheon, built around 114 A.D., is one of the earliest examples of a structure that was built using concrete formwork. What is concrete formwork and how is it used today?

In this episode of the Concrete Logic podcast, Mark Grace of Concrete Support Systems walks us through some of the different types of formwork commonly used. Also, Mark shares his best practices when it comes to utilizing formwork on your next project and the astonishing percentage of concrete contractors that don't follow these simple procedures.  

Episode References

Guest: Mark Grace | Concrete Support Systems | [email protected]

Guest Website: http://www.concretesupportusa.com/

Music: Mike Dunton | https://www.mikeduntonmusic.com | [email protected] | Instagram @Mike_Dunton

Host: Seth Tandett, [email protected]

Host website: concretelogicpodcast.com

Get every episode summarized

Each time Concrete Logic publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Hosts & guests

No transcript yet

This episode has not been transcribed. Request it and it moves to the front of the queue.

EP #021 - Supporting Concrete for 1,900 Years

Concrete Logic

0:00
43:59

More episodes

More from Concrete Logic

View all episodes →