Skip to content
TrackPodcasts
newsApr 24, 20261:13

Borderland Expressway Phase 2: Transforming Northeast El Paso

About this episode

Borderland Expressway Expansion: A Game-Changer for Northeast El Paso

The second phase of the Borderland Expressway is underway, stretching nearly seven miles from Martin Luther King Boulevard to Railroad Drive. This $300 million project, once completed, will span eleven miles and connect to New Mexico Highway 13 and Loop 375. The expressway aims to alleviate traffic congestion on I-10 and stimulate commercial development. The first phase, opened in 2025, will serve as a crucial entry point once the full highway is completed in a few years.

Support the show:
Get a discount at https://solipillow.com/discount/dnn.

Advertise on DNN:
[email protected]

This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].

View sources & latest updates:
https://sources.thednn.ai/c38ba0c4f11c9e6d

Get every episode summarized

Each time El Paso News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Hosts & guests

Transcript ready

11 searchable segments. Every word is indexed and playable.

Borderland Expressway Phase 2: Transforming Northeast El Paso

El Paso News Today | 2 Min News | The Daily News Now!

0:00
1:13

Full transcript

El Paso News Today | 2 Min News | The Daily News Now!Borderland Expressway Phase 2: Transforming Northeast El Paso. Machine-transcribed; use the interactive transcript above to jump the player to any line.

Construction is moving fast on the second phase of the Borderland Expressway up in Northeast El Paso. This stretch covers almost seven miles, running from Martin Luther King Boulevard, right at the New Mexico State Line, all the way to railroad drive. Near the Union Pacific tracks, the full highway will span nearly 11 miles and cost more than $300 million. It hooks up with New Mexico Highway 213, also called War Road, on the northwest side, and links the Highway Loop 375 at. Railroad and Transmountain drives on the southeast end. Locals are filling the changes already, like the long-time Bowen Ranch that shut down late in 2025, to clear space for the build. But it sets the ease traffic jams on that clogged middle section of Interstate 10 and spark fresh commercial growth in the area. Meanwhile, the first space from Dire Street to Railroad Drive opened up back in February 2025. It'll serve as a key entry point once the main lanes wrap up in a few years.

TXTOTs pushing this forward to reshape how we move through Northeast El Paso, opening doors for smoother drives and new opportunities ahead. This has been El Paso News Today, powered by AI.

More episodes

More from El Paso News Today | 2 Min News | The Daily News Now!

View all episodes →