
Aureka's Gold Rush: Comstock Project Extension
About this episode
Aureka Limited secures Comstock gold project for five years, enabling small-scale production studies. High-resolution LiDAR survey creates precise digital model for engineering and operational planning. Maiden resource of 56,500 ounces, with recent drilling hitting 65.37 g/t gold. Historically rich quartz reefs, now viable with gold at $5,000/oz. Near active mills and community outreach underway for potential restart.
Support the show:
Get a discount at https://solipillow.com/discount/dnn.
Advertise on DNN:
[email protected]
This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].
View sources & latest updates:
https://sources.thednn.ai/50c794c8c8db8da1
Interactive timestamps
Jump to segmentGet every episode summarized
Each time Sydney News Today | 2 Min News | The Daily News Now! publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
Transcript ready
22 searchable segments. Every word is indexed and playable.
Full transcript
Sydney News Today | 2 Min News | The Daily News Now! — Aureka's Gold Rush: Comstock Project Extension. Machine-transcribed; use the interactive transcript above to jump the player to any line.
0:00Welcome to Sydney News Today, two minutes of news that matter to Sydney. A Rika Limited has renewed its key exploration license for the historic Comstock Gold Project in Victoria, securing the site and surrounding areas, until 2030. This five-year extension lets the company advance studies for possible small-scale gold production at the old open pit mine. The firm also finished a high-resolution LiDAR and photogrammetry survey of the pit, capturing over 300 data points per square meter. This creates a precise digital model to guide engineering designs, geology work, and operational plans. The project boasts a maiden resource of 1.45 million tons, grading 1.21 grams per ton gold, for 56,000 five, 100 ounces, recent diamond drilling, totaling more than 2,200 meters, its standout results, like 1 meter at 65.37 grams per ton gold. Located 2 kilometers north of St. Arno Town, the site was last mined in 1995, amid a gold
1:03field known for rich quartz reefs. Historically, the area yielded over 400,000 ounces at an average 15 grams per ton during Victoria's Gold Rush. With gold now topping $5,000 USD per ounce up from under 400 back then, the shallow ounces look far more viable. The pit sits near active mills for quick processing, and Erika has tapped mining experts for community outreach and regulatory steps toward A, potential restarting. D&N is brought to you by our sponsor. Do not just fall asleep, drift into what you are listening to, SOLI solelypillow.com
More episodes
More from Sydney News Today | 2 Min News | The Daily News Now!

Ben Roberts-Smith's Overseas Moves Unveiled
Sydney News Today | 2 Min News | The Daily News Now!

NDIS Cuts vs Gas Tax: A Fair Budget Debate
Sydney News Today | 2 Min News | The Daily News Now!

Sandilands & Henderson's Radio Battle: Legal Fight Heats Up
Sydney News Today | 2 Min News | The Daily News Now!

David Malouf: Bridging Worlds with Words
Sydney News Today | 2 Min News | The Daily News Now!