About this episode
Subsea interconnectors are a very discreet sector, it entails decade-long developments…but are developing fast and have become critical to increasing renewables penetration and enhancing energy security. They were originally developed around the North Sea and the Baltic Sea by TSO (Transmission System Operators) but have now caught the interest of large private infrastructure investors. Those HVDC cables, running for hundreds of kms under the seabed, can carry (in both ways) power equivalent to a nuclear plant.
How are those projects being developed? What are their revenue models? What are the technical options? What does the future look like as pharaonic projects liking continents are now being considered? Gerard and Laurent provide an in-depth view into the beauty and sophistication of those projects with the “captain Nemo” of interconnectors, Simon Ludlam.
Simon, a former investment banker, is the founding partner of Etchea Energy which currently provides the Management Team to the Irish MaresConnect interconnector project. Etchea Energy previously provided Project Director services to the €500m Greenlink Interconnector where it was successful in introducing Cap & Floor regulation in Ireland, securing PCI status for the project, and raising equity finance for the construction phase. Prior to Greenlink, Simon originated and led the development of the €600m ElecLink interconnector project through the Channel Tunnel.
We thank our friend and partner Aquila Capital for supporting the show
How are those projects being developed? What are their revenue models? What are the technical options? What does the future look like as pharaonic projects liking continents are now being considered? Gerard and Laurent provide an in-depth view into the beauty and sophistication of those projects with the “captain Nemo” of interconnectors, Simon Ludlam.
Simon, a former investment banker, is the founding partner of Etchea Energy which currently provides the Management Team to the Irish MaresConnect interconnector project. Etchea Energy previously provided Project Director services to the €500m Greenlink Interconnector where it was successful in introducing Cap & Floor regulation in Ireland, securing PCI status for the project, and raising equity finance for the construction phase. Prior to Greenlink, Simon originated and led the development of the €600m ElecLink interconnector project through the Channel Tunnel.
We thank our friend and partner Aquila Capital for supporting the show
Get every episode summarized
Each time Redefining Energy publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
Hosts & guests
No transcript yet
This episode has not been transcribed. Request it and it moves to the front of the queue.
More episodes
More from Redefining Energy

244. AI Transforming Distribution Grids - Aug26
Redefining Energy
Aug 31, 202630:43pending

243. From EVs to BESS: Why capital is flowing to batteries - Aug26
Redefining Energy
Aug 24, 202621:05pending

242. HVDC & the Grid of the future - Michael Barnard - Aug26
Redefining Energy
Aug 17, 202641:31pending

241. The Great Oxford Debate: “Energy and Aristotle" - Aug26
Redefining Energy
Aug 10, 202634:00pending